Togo inks deal with AMEA Power to extend production capacity of Blitta PV plant

Energy
Tuesday, 05 December 2023 18:57
Togo inks deal with AMEA Power to extend production capacity of Blitta PV plant

(Togo First) - Togo will expand the production capacity of its Blitta PV plant (located 260 km from Lomé), by 30MWp. UAE-based AMEA Power will finance the extension, in line with a deal it signed with Togo on December 2, 2023, in Dubaï. The deal was signed on the sidelines of the ongoing COP28 summit. 

Besides the added capacity, AMEA will provide the plant with another battery with a minimum storage capacity of 10MWh. The support’s amount has not been disclosed at the moment.

AMEA Power, a subsidiary of Al Nowais Investments (ANI), develops the Blitta plant. It was awarded a 25-year operating permit.

Equipped with over 5,000 panels, the Blitta plant has a basic capacity of 50 MWp. At the moment, works are underway at the facility to bring this capacity to 70 MWp (ed.note: excluding the new addition). The project received a CFA21 billion financing from the West African Development Bank (BOAD) and the Abu Dhabi Fund for Development (ADFD). 

Esaïe Edoh 

To contact us: c o n t a c t [@] t o g o f i r s t . c o m

Please publish modules in offcanvas position.